Projects & development

How the hub has grown, and what is planned.

A dated record of pipeline projects at Patoka, from the Southern Access Extension in 2016 to the Southern Illinois Connector expected in 2028.

Aerial view of a pipeline manifold: white pipes, valves and grey steel stairways on a gravel pad

Projects & development

How the hub has grown, and what is planned.

Each project carries its status as of September 2026 and the source it is based on. Planned projects depend on regulatory approvals and may change.

  1. Apr–May 2026

    Southern Access Extension expansion open season

    Enbridge offered up to 50,000 barrels per day of additional capacity on the line into Patoka, with service to Patoka or onward to Nederland, Texas via ETCO. The outcome has not been confirmed here.

    Outcome unknown

    Open season notice

  2. 2025 → Jul 2028

    Southern Illinois Connector

    A joint Energy Transfer and Enbridge pipeline of about 56 miles from Wood River to Patoka, expected to carry at least 156,000 barrels per day. Sanctioned in November 2025; pending final approvals, construction is to start in early 2028 with service expected in July 2028.

    Planned

    Project website

  3. Dec 2021 – Jan 2022

    Capline reversal

    The 632-mile, 40-inch Capline began interim southbound service on 18 December 2021 and full service on 1 January 2022, carrying crude from Patoka to St. James, Louisiana.

    Completed

    MPLX release

  4. Jun 2017

    Bakken Pipeline in service

    Dakota Access and ETCO began carrying Bakken crude from North Dakota through Patoka to Nederland, Texas.

  5. Jan 2016

    Southern Access Extension

    Enbridge’s line from Flanagan, Illinois to Patoka began shipping crude.

    Completed

    Hart Energy

  6. 1938

    Salem Oil Field

    The Salem Oil Field was established in Marion County, part of an oil history in the area that reaches back to the first Illinois wells of the 1860s.

Pipeline connectivity

Where northern supply meets southern and Midwest refining.

Crude reaches Patoka from North Dakota, from Western Canada by way of Flanagan, Illinois, and from the Wood River area. From the hub it moves south to the Texas and Louisiana Gulf Coast, or into other pipelines serving Midwest refiners.

InboundOrigin

Dakota Access Pipeline

Bakken / Three Forks, North Dakota

Energy Transfer · approx. 1,170 miles, 12–30 inch · in service 2017

Southern Access Extension

Flanagan, Illinois

Enbridge · carries Western Canadian crude from the Enbridge Mainline · in service 2016

Wood River–Patoka system

Wood River, Illinois

Marathon Pipe Line

Southern Illinois Connector Planned

Wood River, Illinois

Energy Transfer and Enbridge · approx. 56 miles · in service expected July 2028, pending approvals

PATOKA

Tank storage and pipeline interchange · Marion County, Illinois

OutboundDestination

Energy Transfer Crude Oil Pipeline (ETCO)

Nederland, Texas

Energy Transfer · approx. 745 miles, mostly 30 inch

Capline

St. James, Louisiana

Operated by Marathon Pipe Line · 632 miles, 40 inch · southbound since reversal, full service 1 January 2022

Other pipelines

Midwest refining markets

Onward connections described in Energy Transfer’s Form 10-K, FY2025

Map of the contiguous United States with schematic lines joining the Bakken area of North Dakota, Flanagan and Wood River in Illinois to Patoka, and Patoka to Nederland, Texas and St. James, Louisiana
Origins and destinations connected at Patoka. Lines are schematic and do not show pipeline routes. Sources: Energy Transfer, Enbridge, MPLX, U.S. EPA

Patoka Oil Terminal

Between the wellhead and the refinery, there is Patoka.

For enquiries about the terminal, its connections and commercial opportunities, contact the Patoka team.

Inbound · North Dakota · Western Canada · Wood River

Hub · Patoka, Marion County, Illinois

Outbound · Gulf Coast · Midwest refining